Moreover, Desk 1 presents an Examination of the 7000-square-meter Workplace making in Qatar where the optimization of heating, air flow, and air conditioning units and hundreds was executed to reduce the building’s Electrical power consumption. However, the research found which the payback period of time for these strategies was rather long (Alns